Bent Nail Brewery Plans.
|
Brew Base
|
Controller Enclosure
|
3D Controller
|
Getting power
|
Got my electronics!
|
System Schematic
|
getting some of it installed
|
Started on wires
|
More Wiring
|
Even more wiring!
|
Wiring mostly done
|
HLT Bought and Drilled.
|
Got the HE installed
|
Brewpot!
|
Thermistors installed
|
Pickup Tubes
|
Controler Labels
|
We have Ignition!
|
Test Boil Day!
|
Look ma, I made a stick!
|
Is it a bottom? That would be False!
|
Stir Plate Day
|
Crane?
|
Duck and Cover
|